| Punto | Municipio | Potencia | Conectores |
|---|---|---|---|
| Casa Rica Los Laureles | Asuncion | 11 kW | GB-T AC - GB/T 20234.2 (Tethered Cable), Type 2 (Tethered Connector) |
1 estaciones ·
| Punto | Municipio | Potencia | Conectores |
|---|---|---|---|
| Casa Rica Los Laureles | Asuncion | 11 kW | GB-T AC - GB/T 20234.2 (Tethered Cable), Type 2 (Tethered Connector) |